Page 4 - SAL - BHP BILLITON RGP 5 PROJECT

Basic HTML Version

Highly Experienced Crew Working Safely
Careful planning and a challenging lifting arrangement was required to
load, gently stow, and discharge 3 x 10 modules and 1 x 8 modules
per vessel.
The operation was conducted by SAL’s highly specialised crew with long
term experience and training in the field of heavy lift.
SAL is fully dedicated to a comprehensive Health, Safety and
Environmental Policy. Since 2006, all vessels are cer tified for OHSAS
18001 and ISO 14001 by the DNV and all newbuildings are equipped
with an
environmental passport
.