OUR SOLUTIONS
WIKINGER WIND FARM –
TEST PILE CAMPAIGN
Location
German sector of the Baltic Sea,
north-east of the island of Rügen
Client-provided items (CPI)
Nine piles, largest: 36 m long,
diameter approx. 1.4 m, weight up to 47 t
Maximum lift weight
165 t (piling frame and hydro-hammer)
Vessel modifications and deck equipment
• Piling frame (“Triplex Template”)
• Piling hammer and follower
• Testing beam
• WROV RENEWABLES
• Tugger winches
• Temporary accommodation units
Scope of work
Transport and installation of nine test piles at
three locations at water depths of up to 40 m
13