Page 8 - SAL_Company_Brochure_2017_07_web
P. 8
OUR SOLUTIONS
MA-D6
Location
Offshore Kakinada, India
Client-provided items (CPI)
Nine suction anchor piles
One manifold installation suction pile
One production manifold
One STP buoy
Maximum weight
330 t manifold
150 t suction piles
Vessel modifications and deck equipment
The main deck equipment item was a 330 t linear winch
OIL & GAS Scope of work
and over-boarding sheave.
• Transportation to site of the CPI
• Over-boarding of the subsea items followed by
lowering to cross-haul depth
• Over-boarding of the STP buoy
8