During deployment and installation, the MV Lone was supported by the client’sdiving support vessel (DSV)
Divers were deployed to the sea bed to assist with structure positioning and de-rigging
Due to the short time between Contract Award and Offshore Execution a pennant and hang-off system was used instead of SAL Offshore’s preferred method of re-reeving the cranes to reach the required depth.