Please enable JavaScript.

Panther Project

Vessels

MV Trina (Type 176)
MV Calypso (Type 116)
MV Hanna (Type 171)

Client

Chevron

POL

MV Trina: Kalundborg
MV Hanna: Kalundborg, Denmark and Velsen, NL
MV Calypso: Onne, Nigeria

POD

MV Trina, MV Hanna: Onne, Nigeria
MV Calypso: Warri, Nigeria

Cargo

27 reels up to 281 mtons:
18 reels on MV Hanna,
9 reels on MV Trina.
1 tensioner on MV Hanna

Final purpose of cargo

Part of a redevelopment of Chevron oil and gas fields in Nigerian shallow waters

Specials

Compliance with high client standards


Navigating complexities: Redefining oil field logistics in Nigerian waters

In a recent complex maritime operation, JSI Alliance showcased their maritime expertise in the Nigerian oil and gas sector. The project involved the MV Trina, MV Calypso, and MV Hanna, which were tasked with the transport of significant cargo – 27 heavy reels integral to Chevron’s redevelopment efforts in Nigeria's shallow waters.

Each vessel played a crucial role, with MV Hanna and MV Trina transporting reels from Kalundborg, Denmark, and Velsen, Netherlands, to Onne, Nigeria. The MV Calypso served as a shuttle vessel from Onne to Warri, assisting in offloading to offshore vessels due to its superior lifting capabilities in shallow drafts.

The operation faced stringent requirements for loading, securing, and transporting the cargo, adhering to Chevron’s high standards. SAL Engineering (Manila) was instrumental in the engineering preparations and supervised the loading in Kalundborg, ensuring all technical and operational challenges were meticulously managed.

This project, engaging three vessels over a period of about 130 days each, was not only a testament to the effective project management by JSI Alliance but also highlighted the vital local support provided by Harren Nigeria. Their on-ground assistance in commercial, operational, and logistic aspects was pivotal for the seamless execution of this high-stakes project.

Through close client dialogue and robust local support, this operation exemplifies how targeted engineering solutions and effective project management can address complex logistical challenges in the oil and gas industry.

Gallery