WIKINGER WIND FARM – TEST PILE CAMPAIGN
Location
German sector of the Baltic Sea,
north-east of the island of Rügen
Items
Nine piles, largest: 36 m long, diameter approx. 1.4 m, weight up to 47 t
Weight
165 t (piling frame and hydro-hammer)
Scope of work
- Installation of nine test piles at three locations at water depths of up to 40 m
- Strike and pull out tests (phase 2)
Specials
Vessel modifications and deck equipment:
- Piling frame (“Triplex Template”)
- Piling hammer and follower
- Testing beam
- WROV
- Tugger winches
- Temporary accommodation units
Gallery
Wikinger Test Pile Project Phase I
![Wikinger Test Pile Project Phase I](https://sal-heavylift.com/typo3temp/assets/_processed_/7/4/csm_orcaflex_template_c8723e6907.jpg)
![Wikinger Test Pile Project Phase I](https://sal-heavylift.com/typo3conf/ext/salext/Resources/Public/Assets/Gallery/Images/loupe.png)
Wikinger Test Pile Project Phase II
![Wikinger Test Pile Project Phase II](https://sal-heavylift.com/typo3temp/assets/_processed_/9/4/csm_wikinger_II_01_cb94d63c59.jpg)
![Wikinger Test Pile Project Phase II](https://sal-heavylift.com/typo3conf/ext/salext/Resources/Public/Assets/Gallery/Images/loupe.png)
Downloads
SAL Heavy Lift – Renewables Brochure