Please enable JavaScript.

WIKINGER WIND FARM – TEST PILE CAMPAIGN

Vessel

MV Lone

Location

German sector of the Baltic Sea,
north-east of the island of Rügen

Items

Nine piles, largest: 36 m long, diameter approx. 1.4 m, weight up to 47 t

Weight

165 t (piling frame and hydro-hammer)

Scope of work
  • Installation of nine test piles at three locations at water depths of up to 40 m
  • Strike and pull out tests (phase 2)

Specials

Vessel modifications and deck equipment:

  • Piling frame (“Triplex Template”)
  • Piling hammer and follower
  • Testing beam
  • WROV
  • Tugger winches
  • Temporary accommodation units

Gallery

Downloads

SAL Heavy Lift – Renewables Brochure

pdf (5 MB)